NOTICE OF DRAWDOWN TOWN: WINDHAM
Beginning September 27, 2010, FirstLight Power Resources, the owner and operator of the Scotland Hydroelectric Project located on the Shetucket River, will commence lowering the water level above the Scotland Dam approximately 14 feet from its normal point to allow for maintenance activities in and around the dam. The water level is expected to begin to return to its normal elevation on October 2, 2010.Please note that this schedule may change at any time based on weather conditions and FirstLights need to generate electricity at the time of the drawdown.
Posted Mon Sep 20, 2010 5:22 pm